Chalk River Laboratories Near Surface Disposal Facility Project

The Near Surface Disposal Facility (NSDF) is a proposed engineered disposal facility for low-level radioactive waste planned for the Chalk River Laboratories site (CRL). The CRL site is located in Renfrew County, ON, on the shore of the Ottawa River, approximately 200 km northwest of Ottawa. The site is situated within the boundaries of the Corporation of the Town of Deep River.

Read the CNSC’s open letter on the Near Surface Disposal Facility Project

Near Surface Disposal Facility Project Timelines related to the licensing, the Environmental Impact Statement (EIS) and the Environmental Assessment (EA) for the proposed Near Surface Disposal Facility (NSDF) project from Canadian Nuclear Laboratories (CNL). Click on the links below for further information on the timeline entries. May 5, 2016 Notice of commencement of an EA May 24, 2016 Public comments invited on project description May 25, 2016 Notice of Participant Funding October 19, 2016 Public comments invited on the revised project description March 8, 2017 Record of Decision on the scope of the EA March 17, 2017 Public comments invited on draft EIS March 31, 2017 CNL submission of licence application for NSDF April 26-27, 2017 CNSC open houses (Deep River and Sheenboro) August 31, 2017 CNSC completes initial review of draft EIS and licence documentation October 2-4, 2017 CNSC open houses (Sheenboro, Pembroke, Deep River) November 24, 2017 Update on the status of the project We are here To be confirmed CNL submission of final EIS and licence documentation To be confirmed CNSC technical review of EIS and licence application To be confirmed CNSC staff Commission member document and EA report available for public review To be confirmed Public intervention deadline To be confirmed Commission hearing for EA and licensing decisions To be confirmed Commission decision announcement

About the project

Canadian Nuclear Laboratories (CNL) is proposing to construct a radioactive waste disposal facility. The NSDF is planned to have an operating period of at least 50 years and, as proposed, would be an engineered mound built at near-surface level on the CRL site. The proposed project would also include a wastewater treatment plant, supporting facilities and site infrastructure. All waste to be disposed at the NSDF will be required to meet the waste acceptance criteria established to assure compliance with operational and long-term safety requirements of the disposal facility.

The NSDF proposal requires authorization by the Canadian Nuclear Safety Commission (CNSC). In order to construct the proposed NSDF, CNL must apply to the Commission to amend their current Chalk River Laboratories (CRL) operating licence and undergo a review pursuant to the Nuclear Safety and Control Act (NSCA). The CNSC has also determined that the project requires a federal environmental assessment (EA) pursuant to the Canadian Environmental Assessment Act, 2012.

About the environmental assessment

An EA under CEAA 2012 is a planning and decision-making tool. Its objectives are to minimize or avoid adverse environmental effects before they occur, and incorporate environmental factors into decision making. An EA decision affirming that the proposed activities will not cause significant adverse environmental effects is also required before the CNSC can make a licensing decision on this proposal.

As part of the EA, CNL is also required to provide details on the alternative means that were assessed for carrying out the proposed project. It should be noted that the CNSC does not prescribe methods for waste disposal. However, it is mandated to ensure that the method chosen by the licensee or applicant does not pose a risk to the public or the environment.

On March 8, 2017, the Commission issued a decision on the extent of information to be included in the EA. The decision took into account the public comments received related to the project description, as well as CNSC staff recommendations. The Commission determined that the proposed project must include the factors mandated in paragraphs 19(1)(a) to (h) of CEAA 2012, with no additional factors requiring consideration.

Read the latest information related to the NSDF environmental assessment

About the CNSC’s review of the proposed project

CNSC staff undertook a review of CNL’s draft environmental impact statement (EIS) and conducted a licensing review pursuant to the NSCA and its associated regulations. As the responsible authority, and working with other federal departments, CNSC staff have identified a number of areas where additional information will need to be included in the final EIS and other technical supporting documentation. Complete licensing and EIS submissions are required before CNSC staff can complete their assessment and proceed to public hearings. There are currently no timeframes associated with the submission of CNL’s revised documentation.

About public participation

Following receipt of a complete licensing submission and final EIS, CNSC staff’s assessment of the licence amendment and the EA report, by way of a Commission member document, will be available to the public and Indigenous groups at least 60 days prior to the Commission’s public hearing, the date of which has not been set. The public will be offered the opportunity to submit written and/or oral interventions.