Language selection

Search


Document History of REGDOC-2.4.1, Deterministic Safety Analysis

View REGDOC-2.4.1, Deterministic Safety Analysis

Summary

Regulatory document REGDOC-2.4.1, Deterministic Safety Analysis, sets out requirements and guidance for the preparation and presentation of a safety analysis, including the selection of events to be analyzed, acceptance criteria, safety analysis methods, and safety analysis documentation, to demonstrate the safety of a nuclear facility.

The CNSC’s Fukushima Task Force Report and the CNSC Integrated Action Plan on the lessons learned from the Fukushima Daiichi nuclear accident identified improvements to existing regulatory documents to strengthen the regulatory framework. REGDOC-2.4.1 includes targeted amendments to existing requirements that are specified in regulatory documents RD-310, Safety Analysis for Nuclear Power Plants, and RD-308, Deterministic Safety Analysis for Small Reactor Facilities, to address the lessons learned from the Fukushima event.

This document includes content from GD-310, Guidance on Safety Analysis for Nuclear Power Plants, published in March 2012, which already included changes driven by the lessons from the Fukushima accident. As a result, the existing content has been integrated into REGDOC-2.4.1.

Status

May 2014: Published

Document History

Document Milestone Dates Links
Publication of REGDOC-2.4.1 May 23, 2014 View REGDOC-2.4.1, Deterministic Safety Analysis
Presentation to the Commission March 27, 2014

View the consultation report [PDF | 15 pages, 104 KB]

View the public consultation comments table [PDF | 55 pages, 423 KB]

View the supplementary comments received [PDF | 14 pages, 146 KB]

Additional consultation: limited to those who participated during initial consultation period August 22 to October 21, 2013

View the email to commenters [PDF | 2 pages, 66 KB]

View the comments table [PDF | 95 pages, 419 KB]

View the additional consultation version of REGDOC-2.4.1, Deterministic Safety Analysis

Presentation to the Commission August 22, 2013

View the consultation report [PDF | 8 pages, 40 KB]

View the comments received [PDF | 134 pages, 565 KB]

Consultation on REGDOC-2.4.1 July 20 to December 12, 2012

View the Fukushima omnibus amendments [PDF | 43 pages, 428 KB]

Comments and feedback are available upon request

Consultation on GD-310 March 2012 View GD-310, Guidance on Safety Analysis for Nuclear Power Plants [PDF | 56 pages, 572 KB]
Consultation on RD-308 June 2011 View RD-308, Deterministic Safety Analysis for Small Reactor Facilities
Consultation on RD-310 February 2008 View RD-310, Safety Analysis for Nuclear Power Plants

Related CSA Standards

  • N290.15-10, Requirements for the Safe Operating Envelope of Nuclear Power Plants
  • N286.7-99, Quality Assurance of Analytical, Scientific and Design Computer Programs for Nuclear Power Plants

How to gain free access to all nuclear related CSA standards

Contact information

For questions and information related to REGDOC-2.4.1, Deterministic Safety Analysis, please contact CNSC Public Information or mail it to:

Directorate of Assessment and Analysis

Canadian Nuclear Safety Commission
280 Slater St
PO Box 1046 Stn B
Ottawa ON
K1P  5S9
Canada

Telephone: 1-800-668-5284 (Canada only)
Fax: 613-995-5086

Related links

Page details

Date modified: