Letter to Ontario Power Generation regarding Regulatory Hold Point 2 – Darlington Unit 3
Regulatory Operations Branch
Sent by email only
May 20, 2023
Mr. Richard Geofroy
Senior Vice President, Nuclear
Ontario Power Generation Inc.
1 Holt Road South, P.O. Box 4000
Bowmanville, ON L1C 3Z8
richard.geofroy@opg.com
Ms. Subo Sinnathamby
Senior Vice President, Refurbishment
Ontario Power Generation Inc.
1855 Energy Drive, 3C14
Courtice, ON L1E 0E7
subo.sinnathamby@opg.com
SUBJECT: Darlington NGS - Unit 3 Return to Service: Request for CNSC Consent to Remove the Regulatory Hold Point for Prior To Removal of Guaranteed Shutdown State
Dear Mr. Geofroy and Ms. Sinnathamby:
The purpose of this letter is to respond to Ontario Power Generation’s (OPG) submission [1], which requests removal of Regulatory Hold Point-2 (RHP-2), allowing the Guaranteed Shutdown State to be removed in the refurbished Darlington Unit 3 reactor.
Canadian Nuclear Safety Commission staff’s assessment [2] of OPG’s submission [1], as well as all supporting documentation, concluded that OPG has met all the pre-requisites established by the Commission to remove RHP-2. Therefore, as the person authorized by the Commission and pursuant to Licence Condition 15.4 of the Darlington Nuclear Generating Station Power Reactor Operating Licence 13.03/2025, I consent to remove RHP-2 and OPG may now proceed with surrendering GSS to restart the refurbished reactor at low power for testing and verification.
Yours sincerely,
Ramzi Jammal
Executive Vice-President and
Chief Regulatory Operations Officer
Regulatory Operations Branch
c.c: A. Viktorov, J. Burta, A. Mathai, M. Rickard, C. Loreti, N. Abonasara, A. Oussoren, C. Badal, C. Brown, C. Chan, Darlington Site Office
References:
- OPG Letter, R. Geofroy and S. Sinnathamby to R. Jammal, “Darlington NGS Refurbishment – Unit 3 Return to Service: Request for CNSC Consent Prior to Guaranteed Shutdown State (GSS) Removal (RHP 2)”, May 16, 2023.
- CNSC staff document entitled: “Request by Ontario Power Generation Inc. to Remove Regulatory Hold Point for Prior to Guaranteed Shutdown State for Unit 3”, May 19, 2023.
- CNSC Letter, J. Burta to S. Gregoris and S. Sinnathamby, “Ontario Power Generation Protocol with the Canadian Nuclear Safety Commission for Darlington Nuclear Generating Station Unit 3 Return to Service-Revision 2”, April 5, 2023.