Impact Assessment Act – Presentation
Impact Assessment Act – Presentation (PDF, 50 pages, 1.79 MB)
Outline
- Overview of the federal Impact Assessment (IA) legislation
- IA Process for Nuclear Designated Projects
- Federal Lands Review under the Impact Assessment Act (IAA)
- Other CNSC Environmental Reviews
Part 1: Overview of the Federal Impact Assessment Legislation
Background
- In June 2016, the federal government launched a review of federal environmental and regulatory processes
- including a review of processes for federal environmental assessments
- did not include review of CNSC’s regulatory process
- The objective was to seek Canadians’ input on improvements to the current processes
Guiding principles for federal review of environmental and regulatory processes:
- transparent environmental assessment and regulatory processes
- participation of Indigenous peoples in all phases
- inclusive and meaningful public engagement
- timely, evidence-based decisions based on reflecting the best available science and Indigenous knowledge
- one project – one assessment
Consultation included
- an independent Expert Panel Review
- three related Parliamentary reviews on the National Energy Board, the Fisheries Act and the Navigable Waters Protection Act
- a federal “white paper” on the proposed changes
- significant consultation with National Indigenous Organizations
- continuous bilateral and multi-stakeholder meetings
The nuclear industry was consulted throughout these consultation activities
Bill C-69 was tabled on February 8, 2018 to
- replace the Canadian Environmental Assessment Act, 2012 (CEAA 2012) with the Impact Assessment Act
- replace the National Energy Board Act with the Canadian Energy Regulator Act
- undertake significant changes to the Navigation Protection Act
On June 21, 2019 Bill C-69 received Royal Assent
Legislative Changes
The Impact Assessment Act came into force on August 28, 2019
- created the new Impact Assessment Agency of Canada and repealed the CEAA 2012
- includes transitional provisions
- any designated project started prior to August 28, 2019 remains under CEAA 2012
- designated projects, projects on federal lands
Difference between Impact Assessment and Environmental Assessment – process considerations
From Environmental Assessment under CEAA 2012 | To Impact Assessment under the IAA | |
---|---|---|
Governance | CNSC was the sole Responsible Authority to carry out EAs for designated nuclear projects | The Impact Assessment Agency of Canada is solely responsible for the conduct of impact assessments |
Early Planning Phase | Not applicable under CEAA 2012 | This phase includes public participation and Indigenous engagement activities. CNSC would provide advice and technical expertise to the Agency |
Review Process | Designated projects were assessed using the processes established under the CNSC’s legislation | All designated nuclear projects will be referred to a Review Panel |
Decision making | The Commission makes the EA and licensing decisions for designated nuclear projects | For designated nuclear projects, the Governor-in-Council makes the IA decision. The Commission will then make the licensing decision. |
Enforcement | The Commission issues the EA decision statement with enforceable conditions. All conditions are integrated into the CNSC licence. | The Minister of the Environment and Climate Change Canada issues the IA decision statement with enforceable conditions. For designated nuclear projects, the Minister may designate any conditions that are included in the decision statement to be part of the license issued by the CNSC. |
Difference between Impact Assessment and Environmental Assessment – technical considerations
From Environmental Assessment under CEAA 2012 | To Impact Assessment | under the IAA|
---|---|---|
Scope of assessment | Scope focused on environmental factors | The scope broadened to include the following factors:
Includes the principle of sustainability |
IAA Regulations
Physical Activities Regulations
- describes designated projects (Project List)
- refer to Annex A for key changes to the Project List
Information and Management of Time Limits Regulations
- outlines the information that the proponent must provide to support early planning
- outlines the documents the Agency must provide to guide the IA
- provides the circumstances in which the Agency may suspend the legislated timelines
Designated Projects
- Designated projects are described in the Physical Activities Regulations (Project List)
- Project List was developed to capture major projects with the greatest potential for adverse effects on areas of federal jurisdiction
- including environmental effects arising from federally regulated projects related to nuclear, interprovincial pipelines and offshore energy activities
- Minister may designate any project not described in regulations, based on factors set in the legislation
Part 2: IA Process for Nuclear Designated Projects
Impact Assessments of Nuclear Designated Projects
- Impact assessments of all designated projects regulated by the CNSC will be conducted by a Review Panel
- The goal is a single process to discharge the requirements of both the IAA and the Nuclear Safety and Control Act (NSCA)
“One project, one review” for designated projects regulated by CNSC
Memorandum of Understanding
- In October 2019, the CNSC signed a Memorandum of Understanding with the Impact Assessment Agency of Canada
- Eight annexes to the MOU outlining roles and responsibilities of the Agency and the CNSC:
- Information Sharing and Notification
- Public Engagement and Participation
- Crown Consultation
- Appointment to rosters and Review Panels
IA Process Overview
Impact Assessment Overview Process
The key participants in the impact assessment system are:
- Proponent
- Indigenous groups
- Impact Assessment Agency of Canada
- Other jurisdictions
- Review panel
- Federal Authorities
- Minister
- Governor in Council
- Public
Phase 1: Planning (180 days)
The key participants are:
- Proponent
- Indigenous groups
- Impact Assessment Agency of Canada
- Other jurisdictions
- Federal Authorities
- Public
CNSC participation in engagement with public and Indigenous groups
CNSC support in development of outputs:
- Public Participation Plan
- Indigenous Engagement and Partnership Plan
- Impact Assessment Cooperation Plan
- Tailored Impact Statement Guidelines
- Permitting Plan
Tailored Impact Statement Guidelines
CNSC inputs in the development of the Tailored Impact Statement Guidelines for a proposed project
The Guidelines provide direction to the proponent on the Impact Statement including
- factors to be considered
- the methodology to be followed
- other information requirements
Sets the scope of the Review Panel under the Impact Assessment Act
Public Participation and Indigenous Consultation
- The Agency will lead the whole-of government consultation activities
- once the IA decision is made, the CNSC takes the lead on Crown consultation activities
- CNSC will work with the Agency on all public participation and Indigenous consultation activities
- Agency will provide and administer participant funding for IA until issuance of an IA Decision Statement
Phase 2: Impact Statement (3 years)
The key participants are:
- Proponent
- Indigenous groups
- Impact Assessment Agency of Canada
- Other jurisdictions
- Federal Authorities
- Public
Agency will consult the CNSC in the development of the Terms of Reference for the Review Panel
CNSC will assist the Agency in making a determination on conformity of the Impact Statement with Tailored Impact Statement Guidelines
Phase 3: Impact Asessment (300-60s0 days)
The key participants are:
- Proponent
- Indigenous groups
- Impact Assessment Agency of Canada
- Other jurisdictions
- Review Panel
- Federal Authorities
- Public
Appointment of Review Panel Members
- cross-appointment of Members to be Panel of the Commission under the NSCA
Review Panel hold public hearings on both IA and first licence
Review Panel prepares IA report – two parts
- IA recommendations and necessary information for licensing decision
Appointments of Review Panel Members
- For Review Panels,
- the Chairperson is appointed by the Agency
- at least one Member of the Panel would be from the CNSC’s roster of Commission members
- It is proposed that other members of the Review Panel also be appointed as temporary Commission members subject to Governor-in-Council approval
Any subsequent licences, would only be subject to CNSC’s licensing process
Phase 4: Decision-Making (90 days)
The key participants are:
- Minister
- Governor in Council
Referral to Governor-in-Council to make public interest determination
- if in public interest, Minister issues IA decision
Agency will, in consultation with the CNSC, provide advice to the Minister to designate conditions in the IA decision statement to be included in the CNSC licence
If the Minister issues a positive decision, the Review Panel (as the Commission) makes a licensing decision
Phase 5: Post-Decision
The key participants in the impact assessment system are:
- Proponent
- Indigenous groups
- Impact Assessment Agency of Canada
- Review panel
- Federal Authorities
- Public
Any conditions established by the Minister are designated to be part of the CNSC licence:
- conditions will be enforced by the CNSC
Annex B provides a summary of the role of the Review Panel / Commission in the IA process
Related Initiatives under the IAA
- Government of Canada initiatives related to cumulative effects under the IAA:
- Regional Assessments
- Open Science and Data Platform
CNSC readiness for the IAA
- CNSC staff developed an implementation plan to ensure readiness for the IAA
- Key activities include:
- development of MOU with the Agency
- updates to REGDOC-2.9.1, Environmental Principles, Assessments and Protection Measures, v 1.1 to reflect changes to the IAA
- presentations to industry
- ongoing engagement activities with Indigenous groups
- obtaining lessons learned from other federal departments and agencies
- Further examples of CNSC’s readiness for implementing the IAA are provided in Annex C
Part 3: Federal Lands Reviews under the IAA
Projects on Federal Lands
- For projects not on the Project list but proposed on federal lands
- Examples of sites on federal lands include Chalk River Laboratories, Whiteshell Laboratories, Douglas Point Waste Facility, and Royal Military College
- Agency has developed interim guidance
Federal Lands Reviews under the IAA
- Same as CEAA 2012 – scope focused on environmental effects and not other IA factors
- New requirements:
- public comments invited
- posting notices on Public Registry
- factors to consider (s.84):
- adverse impacts on the rights of Indigenous peoples
- Indigenous and community knowledge
- comments received from the public
- technically and economically feasible mitigation measures
Role of the Commission – Projects on Federal Lands
- Federal lands review will be integrated into CNSC’s licensing process
- Commission must determine whether the completion of the proposed project is likely to cause significant adverse environmental effects
Part 4: Other CNSC Environmental Reviews
Other CNSC Environmental Reviews
- Information on the CNSC’s environmental review processes are found in REGDOC-2.9.1, Environmental Protection: Environmental Principles, Assessments and Protection Measures, Version 1.2
- undergoing a revision to capture changes in federal legislation
- Other CNSC Environmental Reviews
- federal lands review under the IAA
- ongoing EAs under CEAA, 2012
- CNSC’s licensing process
- EAs under Provincial/Territorial Regimes or Land Claim Agreements
Ongoing Environmental Assessment under CEAA 2012
- Ongoing projects with EAs initiated under CEAA 2012 are continuing under this current process
- any designated project started prior to August 28, 2019 remains under CEAA 2012
- The IAA contains provisions to enable the projects to advance in this way
Proponent | Project | EA start date |
---|---|---|
Canadian Nuclear Laboratories | Whiteshell Reactor #1 In Situ Decommissioning Project | May 16, 2016 |
Canadian Nuclear Laboratories | Near Surface Disposal Facility Project | May 5, 2016 |
Canadian Nuclear Laboratories | Nuclear Power Demonstration Closure Project | May 5, 2016 |
Global First Power | Micro Modular Reactor Project | July 15, 2019 |
NexGen Energy Ltd. | Rook I Project | May 2, 2019 |
Denison Mines Corporation | Wheeler River Project | May 31, 2019 (on hold at lincensee’s request) |
EAs under Provincial/Territorial Regimes or Land Claim Agreements
- In both cases, the CNSC acts as a technical expert throughout the EA process but has no EA decision-making role
- The Commission retains decision making on licensing matters, and uses the information gathered in the EA process to inform its licensing decision under the NSCA
- When multiple jurisdictions are involved, these processes are harmonized as much as possible to reduce duplication and promote efficiency
Summary – Ongoing Commission Operations
- Environmental effects of all nuclear facilities or activities are considered and evaluated when licensing decisions are made
- All licence applications that demonstrate potential interactions between the facility or activity and the environment are subject to either an environmental protection review under the NSCA or an EA under the CEAA 2012
- For each licensing decision, the Commission (or a Designated Officer) must be satisfied that the applicant or licensee will make adequate provision for the protection of the environment and the health and safety of persons before a licence can be granted
Overall Summary
- Impact assessments of all nuclear designated projects will be conducted by a Review Panel
- MOU in place with IA Agency which outlines roles and responsibilities for Review Panels for nuclear projects
- Commission retains decision-making for licensing matters
- under the IAA, the Minister makes the IA decision
- for federal lands review or environmental protection reviews, the Commission determines if the project is likely to cause significant adverse effects
References
- Impact Assessment Agency of Canada
- Impact Assessment Act
- Impact Assessment Regulations
- CNSC-IAAC MOU and annexes
- CNSC Environmental Reviews
- REGDOC-2.9.1, Environmental Protection: Environmental Principles, Assessments and Protection Measures, Version 1.2
Annex A – Comparison of CEAA 2012 and IAA Project List
CEAA 2012 | IAA project list | Net change |
---|---|---|
The expansion of an existing facility for the processing, reprocessing or separation of an isotope of uranium, thorium, or plutonium, that would result in an increase in production capacity of 50% or more and a total production capacity of 100 t/year or more | The construction, operation and decommissioning of one of a new facility for the processing, reprocessing or separation of isotopes of uranium, thorium, or plutonium, with a production capacity of 100 t/year or more | Threshold increase |
The expansion of an existing facility for the manufacture of a product derived from uranium, thorium or plutonium that would result in an increase in production capacity of 50% or more and a with a production capacity of 100 t/year or more | The construction, operation and decommissioning of one of a new facility for the manufacture of a product derived from uranium, thorium or plutonium, with a production capacity of 100 t/year or more | Threshold increase |
The expansion of an existing facility for the processing or use, in a quantity greater than 1015 Bq per calendar year, of nuclear substances with a half-life greater than one year, other than uranium, thorium or plutonium, that would result in an increase in processing capacity of 50% or more | The construction, operation and decommissioning of a new facility for the processing or use, in a quantity greater than 1015 Bq per calendar year, of nuclear substances with a half-life greater than one year, other than uranium, thorium or plutonium | Threshold increase |
The construction and operation of new facility for the storage of irradiated fuel or nuclear waste, on a site that is not within the licensed perimeter of an existing nuclear facility | The construction and operation of a new facility for the storage of irradiated nuclear fuel or nuclear waste, outside the licensed boundaries of an existing nuclear facility, as defined in section 2 of the Nuclear Safety and Control Act, other than a facility for the onsite storage of irradiated nuclear fuel or nuclear waste associated with one or more new fission or fusion reactors that have a combined thermal capacity of less than 200 MWth | Threshold established |
The construction and operation of a new facility for the long-term management or disposal of irradiated fuel or nuclear waste | The construction and operation of a new facility for the long-term management or disposal of irradiated nuclear fuel or nuclear waste | No change |
The expansion of an existing facility for the long-term management or disposal of irradiated fuel or nuclear waste that would result in an increase in the area, at ground level, of the facility of 50% or more | The expansion of an existing facility for the long-term management or disposal of irradiated nuclear fuel or nuclear waste, if the expansion would result in an increase in the area of the facility, at ground level, of 50% or more | No change |
The construction, operation and decommissioning of a new nuclear fission or fusion reactor. | The site preparation for, and the construction, operation and decommissioning of, one or more new nuclear fission or fusion reactors if that activity is located within the licensed boundaries of an existing Class IA nuclear facility and the new reactors have a combined thermal capacity of more than 900 MWth | Threshold established |
The site preparation for, and the construction, operation and decommissioning of, one or more new nuclear fission or fusion reactors if that activity is not located within the licensed boundaries of an existing Class IA nuclear facility and the new reactors have a combined thermal capacity of more than 200 MWth | Threshold established | |
The construction, operation and decommissioning of a new uranium mine or uranium mill on a site that is not within the licensed boundaries of an existing uranium mine or uranium mill. | The construction, operation and decommissioning, outside the licensed boundaries of an existing uranium mine, of a new uranium mine with an ore production capacity of 2 500 t/day or more. | Threshold established |
The expansion of an existing uranium mine that would result in an increase in the area of mine operations of 50% or more | The expansion of an existing uranium mine, if the expansion would result in an increase in the area of mining operations of 50% or more and the total ore production capacity would be 2500 t/day or more after the expansion. | Threshold increase |
Annex B – Summary of Role of the Review Panel / Commission
Phase | Activity | Role of the Review Panel |
---|---|---|
Planning | Public and Indigenous Engagement Development of Tailored Impact Statement Guidelines and Plans | No role for the Review Panel |
Impact Statement | Development of Terms of Reference for the Review Panel | No role for the Review Panel |
Impact Assessment | Appointment of members of Review Panel Conduct analysis of Impact Statement Prepare Impact Assessment (IA) | Hold hearings on both IA and first licence Prepare IA report and recommendations for conditions to the Minister |
Decision Making | Minister makes IA decision | Make licensing decision, if positive IA decision |
Post Decision | CNSC enforces conditions | Subsequent hearings / licensing decisions |
Annex C – CNSC Readiness for Implementation of IAA
Sector | Activity | Status |
---|---|---|
Collaboration with IAAC and other Government Departments | CNSC-IAAC Memorandum of Understanding and 8 annexes | Completed |
Collaboration agreements with Saskatchewan and Ontario | In progress | |
NWMO-IAAC-CNSC Integrated IA Discussion: APM Project | Completed | |
Public Registry | Develop an enhanced, one-window public registry through a phased approach and improve online tools | Phase 1 – Completed Phase 2 – In progress |
Regulatory framework | Revisions to Regulatory Document-2.9.1, Environmental Protection: Environmental Principles, Assessments and Protection Measures, vs 1.1 | October 2020 (TBC) |
Improvements to Environmental Protection Reviews under the NSCA | Ongoing | |
Communications | Updates to EA webpages, both internally and externally, to reflect changes and make reference to the proposed Impact Assessment Act | Completed |
Internal communications for CNSC staff: all-staff message and social media postings following Royal Assent MOU and Annexes posted on both websites in mid-October open learning session for all-staff delivered in January 2020 | Completed | |
Roster and Panel Members | Potential candidates for CNSC roster and Panel Members | Ongoing |
Training | CNSC staff participated in IAAC-led webinars and training sessions | Completed |
External Awareness (Industry) | CNSC staff have engaged broadly with industry, including presentations to: Canadian Nuclear Association Nuclear Waste Management Office CANDU Owner’s Group Atomic Energy Limited | Completed |